Monday, February 28, 2011

Wallet Friendly Modern Light Fixtures for Kitchen and Dining

Clinker by Innermost
Cool modern light fixtures tend to carry steep price tags. Here are a few sleek designs that will get attention while not being overly pricey.

The first two selections are from Innermost, and work well in the dining room.

For a modern kitchen, the bottom three pendants by LBL Lighting are good choices.

Kaboom by Innermost
The Clinker can be purchased for about $1300. The Kaboom weighs in at approximately $200, and the pendants range between $250-360.

More information on these fixtures can be found at: www.innermost.us
www.lbllighting.com
Cypree Large by LBL Lighting in Washington Park Modern Home
Neutron by LBL Lighing



Tubes by LBL Lighting



Monday, February 21, 2011

Washington Park Home Build Featured on National Network

West Standard clients, Dave and Natalie, talking about their new home
Huff family with West Standard's Brian Dotson
Rendering of Dave and Natalie's modern home


West Standard clients, Dave and Natalie Huff, made their "big screen" debut last week.

Dave and Natalie have generously allowed a national television series to document the design process and construction of their new Washington Park home.

The TV series, premiering later this year, focuses on the challenges and triumphs of building a new home.


West Standard Design Build is a Denver, Colorado based architecture firm and custom home builder creating smarter smaller spaces. More information may be found at: www.WestStandard.com



Wednesday, February 9, 2011

Slab-Over-Void Installation Begins on Washington Park Custom Home

void material placed within foundation's perimeter (brown rectangles)
polyethylene vapor barrier (yellow), and R5 rigid insulation (white)
rebar over rigid insulation
additional rebar placed around concrete piers
Despite Denver's recent cold temperatures and abundant snow fall, West Standard has progressed on the construction of our client's Washington Park modern home.

A small break in the inclement weather allowed for partial installation of the slab-over-void system. This system allows the concrete floor (slab) to be suspended above the soil. Thus, protecting the floor from the site's high water table, as well as swelling that could occur in the underlying earth. Additionally, this system was chosen to deliver on our clients requirement for stained concrete floors in the kitchen, dining, and living areas.

The first step for installing the slab-over-void system is to place a void material within the perimeter of the foundation walls. This material sits directly on the soil, and consists of multiple six inch tall cardboard boxes. The Boxes are reinforced with a grid of vertically oriented cardboard fins. The void material creates a base onto which the concrete will eventually be poured. Over time the void material will degrade leaving the concrete floor suspended above the soil.

20 mil polyethylene sheeting is then placed on top of the void material. The plastic sheeting serves as a vapor barrier keeping ground moisture from the overlying insulation and concrete floor. Next, rigid R5 insulation is placed on top of the plactic sheeting.

Reinforcing bars (rebar) are then set in a grid pattern.  Concrete is very resistant to compression, but relatively week in tension. The rebar is used to carry the tensile load, thus, increasing the concrete's strength.

finished concrete showing tool joints
The final step in this process is the pouring and finishing of the concrete floor. In conjunction with the void material and rebar grid, the floor is supported by a series of previously poured concrete piers. Additionally, The concrete floor is "tied" to the foundation wall with a series of reinforcing bars that extend vertically from the top of the foundation wall. The exposed length of each reinforcing bar is bent to form a right angle with the foundation wall.

finished concrete showing six inch slab
After the concrete is finished the floor must be protected from the cold ambient temperatures while it cures. To accomplish this, the aft floor will be covered with insulating blankets, and the front portion will be enclosed in a tent. Tenting, although more labor intensive, allows for the best possible finish. We are tenting the portion that will ultimately be exposed stained concrete. Blanketing tends to leave a slightly blotchy finish, and this was acceptable in the areas that are to be carpeted.

West Standard is a Denver, Colorado based architecture firm and custom home builder creating modern sustainable experiences. More information may be found at: www.WestStandard.com